The punch walk, room by room

Remodeling gallery: bathrooms, kitchens, basements and floors

A punch walk is the last lap of a job, room by room, finish by finish. These four sheets follow one through Recommended Remodeling work. Each photo carries one line naming the room and what you can see in it, and the basements are labelled as work still in progress, because that is what they are.

Bathrooms

Tile, glass and a tub that fits the wall

Bathrooms are where the finish list is longest: wall tile, floor tile, glass, tub, vanity top, faucet, lights. Chad walks each one at handoff. Plumbing is sub-contracted through the company, so the tub and the tile belong to the same plan.

Primary bathroom with a walk-in shower, a freestanding tub and cube-pattern floor tile

Primary bath: walk-in shower, freestanding tub, cube-pattern floor

Bathroom tub with a tiled surround, a window and a wall niche

Bath: tiled tub surround, window, wall niche

Finished bathroom with a tub, a grey vanity and vanity lights

Bath: tub, grey vanity, vanity lights

Walk-in tiled shower with frameless glass and grey large-format tile

Bath: walk-in tiled shower, frameless glass, grey large-format tile

Frameless glass shower with marble-look tile and a mosaic band

Bath: frameless glass shower, marble-look tile, mosaic band

Bathroom tub and shower with vertical tile and bronze fixtures

Bath: tub and shower, vertical tile, bronze fixtures

Freestanding soaking tub against a textured white wall tile

Bath: freestanding soaking tub, textured white wall tile

Kitchens and cabinets

White cabinets, a backsplash and a floor under them

Cabinets go in first, counters follow, and the backsplash is the last thing the eye settles on. One frame below catches an install while the uppers are still being set.

White shaker kitchen with a mosaic backsplash and dark counters

Kitchen: white shaker cabinets, mosaic backsplash, dark counters

White kitchen cabinets around a range with a mosaic backsplash

Kitchen: white cabinets, range, mosaic backsplash

Kitchen cabinet install under way with white uppers and drawer bases

Kitchen, in progress: white uppers and drawer bases set, install under way

Kitchen with white cabinets, grey plank flooring and stone counters

Kitchen: white cabinets, grey plank floor, stone counters

Floors and rooms

Dark hardwood and plank, wall to wall

Flooring is the quietest part of the walk and the one you stand on every day. Hardwood, plank and fresh paint are shown here as they read in the room.

Empty bedroom with a dark hardwood floor and bright windows

Bedroom: dark hardwood floor, bright windows

Refinished dark hardwood floor beneath a large window

Room: refinished dark hardwood floor, large window

Hallway with plank flooring and fresh paint

Hallway: plank flooring, fresh paint

Basements and framing

A basement before it is a room

The first four frames are work in progress: stud walls, insulation overhead, drywall hung and then taped. None of them is a finished room. The last frame is a finished lower level, so you can see where the walls end up.

Work in progressNot finished
Framed basement walls in a wide view, before insulation and drywall are finished

Basement, in progress: stud walls framed, wide view

Framed basement walls with insulation in the joists overhead

Basement, in progress: new stud walls, insulation overhead, before drywall

Long basement hallway with drywall hung on the walls

Basement hallway, in progress: drywall hung

Basement hallway turn with drywall taped

Basement hallway turn, in progress: drywall taped

Finished lower-level room with carpet and plank flooring

Lower-level room, finished: carpet and plank flooring

Your room on the next sheet

Tell Chad which room is next.

Call 509-464-9873, Monday to Sunday from 7 am to 8 pm, or send a few lines about the project. Every job starts with a consultation and a detailed plan, scoped to fit your budget.